Paradise Valley Legistar Banner
File #: 20-462    Version: 1 Name:
Type: Contract Status: Agenda Ready
File created: 11/24/2020 In control: Town Council
On agenda: 12/3/2020 Final action:
Title: Approval of Construction Contract Amendment No.1 for Lincoln Dr Median Improvements
Attachments: 1. Attachment 1 - Lincoln Conduit Repair Presentation

TO:                                             Mayor Bien-Willner and Town Council Members

 

FROM:                      Jill Keimach, Town Manager

                                          Steven Brunasso, CIO

                                            

DATE:                     December 3, 2020

 

DEPARTMENT: Information Technology

 

Staff Contact Steven Brunasso, 480-348-3671

End

 

AGENDA TITLE:

Title

Approval of Construction Contract Amendment No.1 for Lincoln Dr Median Improvements

Body

 

RECOMMENDATION:

Recommendation

Authorize the Town Manager to execute Amendment No. 1 to contract CON-20-127-ENG with Markham Contracting Co., Inc., in the amount not to exceed $50,000 and to waive the 14-day wait period to sign the agreement.

Background

 

SUMMARY STATEMENT:

On June 25, 2020, Town Council awarded construction contract to Markham Contracting for Lincoln Dr Median Improvements. As part of this contract, the contractor was to identify any areas of fiber conduit repair, if any, and to provide the Town with an estimated cost to repair.

 

In August 2020, the contractor began median improvements east of Tatum Blvd and in October 2020 informed the Town an estimated cost to repair the fiber conduit was unknown and would be tracked on a time and materials basis. The Town declined the offer and sought a second quote from another subcontractor who could guarantee the work not to exceed $50,000.

 

In November, the subcontractor performed inspection of the Town’s fiber conduit on Lincoln Dr from 32nd St to Mockingbird Ln, and found only one repair needed east of Tatum Blvd at approximately 51st St. While the length of the conduit repair is approximately 60 ft long, there is extensive work required to reroute conduit outside of existing concrete encasement as well as median restoration.

 

Contracts originally awarded by the Town Council may be amended only with the approval of the Town Council per Town Code Section 2.3.14.6 Contract Amendments.  The original construction contract in the amount of $2,333,226.88 will be increased by $50,000 for a total contract amount of $2,383,226.88.

 

 

 

BUDGET IMPACT:

The increase of $50,000 for the Lincoln Median Improvements will be paid through the FY21 Contingency transfer to CIP#2020-14 Lincoln Medians: Tatum Blvd to Mockingbird Ln

                     

ATTACHMENT(S):

Attachment A - Presentation