File #: 19-279    Version: 1 Name:
Type: Contract Status: Withdrawn
File created: 6/5/2019 In control: Town Council
On agenda: 6/13/2019 Final action: 6/13/2019
Title: Award of Design Contract for Public Works/Engineering Remodel
Attachments: 1. Contract DWL.pdf, 2. 061319 Public Works & Engineering Remodel.pdf

TO:                                             Mayor Bien-Willner and Town Council Members

 

FROM:                      Jill B. Keimach, Town Manager

                                          Paul Mood, Town Engineer

                                            Jason Harris, Capital Projects Administrator

 

DATE:                     June 13, 2019

 

DEPARTMENT: Engineering

 

Staff Contact Jason Harris, 480-348-3622

End

 

AGENDA TITLE:

Title

Award of Design Contract for Public Works/Engineering Remodel

Body

 

RECOMMENDATION:

Recommendation

Authorize the Town Manager to execute a design contract with DWL Architects for Public Works/Engineering Building Remodel in the amount of $88,933.

Background

 

SUMMARY STATEMENT:

In 2016, the Town initiated a space needs assessment which analyzed Town Hall, Public Works/ Engineering, and the Public Safety buildings for both the current and the future needs. The objective was to understand the space required to provide efficient and effective public services, account for anticipated growth, and provide adequate storage space for plans and documents.

 

The space needs assessment team looked at the buildings in their entirety with complete operations in mind and worked to identify opportunities to efficiently leverage the space identified.

 

For the Public Works building, the space study team identified the following challenges:

                     Inefficient front lobby configuration

                     Limited work space

                     Undersized conference room

                     Parts storage room is too small

                     Sign shop is too small

 

The current fiscal year (FY2019/20) goal is to provide Town staff with schematic concepts and final design of a Public Works facility that will:

                     Create new entry way and optimize lobby area

                     Add efficient office space for anticipated staff

                     Evaluate and add storage space to retain necessary records

                     Add storage space for fleet parts

                     Add new sign shop

 

The Town solicited and selected DWL Architects to perform the Town Campus Remodel in 2017. In the spring of 2018, Town Council reduced the scope to focus on optimizing the space in Town Hall only. Now that Town Hall is designed and is expected to be remodeled in FY2019/20, staff is requesting Town Council’s approval of the design contract with DWL Architects to proceed with concept approval and design of the Public Works/Engineering building remodel in FY2019/20 with the intent to construct in FY2020/21.

 

The tentative project schedule is as follows:

July-Sept 2019                     Schematic Design                                           

Sept                                                                Council review & direction                     

Oct-Jan 2020                     Final Design

Jan                                                                Council review & direction

Feb                                                                Solicit bids through JOC

Mar/Apr                                           Council review JOC pricing

May                                                                Council award JOC contract

July 2020                                           Construction starts

 

 

BUDGETARY IMPACT:

The FY2019/20 Capital Improvement Program budget of $90,000 is for design only. A separate project for construction will be brought to Council for FY2020/21 consideration. Contingent on Council’s direction, the budget impact is as follows:

 

CIP Project #2018-01                     $88,933  Design

 

Award will be contingent on the FY2019/20 Budget/CIP adoption by Town Council and a notice to proceed will be issued on or after July 1, 2019.

 

ATTACHMENT(S):

Presentation

Contract