To: HILLSIDE BUILDING COMMITTEE
Cc: Paul Mood, Town Engineer
Paul Michaud, Senior Planner
George Burton, Planner
From: Robert D Lee, CBO
Building Official, Fire Marshal
Date: December 13, 2017
Subject: Formal review for a new home at 5416 E Desert Jewel Dr
Narrative: This review is for a new residence of 5900 livable sf and a 4-car garage. There are significant rock outcroppings at the southern part of the site. The home is to be constructed of earth tone split face blocks and two-tone stucco.
Description |
Quantities |
Area of Lot |
1.002 acres or 43,655 Sq Ft |
Area Under Roof |
6,409 Sq Ft |
Floor Area Ratio |
14.68% |
Building Site Slope |
20.70% |
Allowable Disturbed Area (%) |
18.59% |
Allowable Disturbed Area (Sq Ft) |
8,116 Sq Ft |
Existing Disturbed Area |
0 Sq Ft |
Proposed Disturbed Area (%) |
18.58% |
Proposed Disturbed Area (Sq Ft) |
8,109 Sq Ft |
Remaining Disturbed Area (%) |
.01% |
Volume of Cut/Fill |
2360/999 Cubic Yards |
Hillside Assurance |
$83,975 |
Number of Retaining Walls |
7 |
Length of Retaining Walls |
398 Ft |
Maximum Building Height |
23 feet 10 inches |
Overall Height |
38 feet 6 inches |
1. All construction parking shall be located on site as much as possible. Any off street parking shall be confined to the north side of E Desert Jewel Dr. No construction materials or debris will be allowed on the Town’s right-of-way.
2. No final approval shall be issued until all hillside stipulations and all Town Code requirements are complied with, including landscaping.
3. Noise from construction that can be heard off-site, including, but not limited to, hydraulic ram hammers, equipment used to cut through rock, machinery with audible back-up warning devices, powered machinery, truck delivery and idling, constant and persistent hammering, shall be limited to use between the hours of 7:00 AM and 5:00 PM Monday through Friday; no work on Saturday, Sunday or legal holidays. Summer hours start one hour earlier.
4. An automatic fire sprinkler system will be installed in all attic spaces.
5. The limits of construction and proposed disturbed areas shall be clearly staked in the field, with visible roping, prior to and during construction and shall conform to the approved individual site analysis plan. No disturbance shall be permitted beyond the areas designated as the limits of disturbance both during and after construction
6. A Financial Assurance in the amount of $83,975 shall be paid prior to the issuance of the building permit.