To: HILLSIDE BUILDING COMMITTEE
Cc: Paul Michaud, Senior Planner
George Burton, Planner
From: Robert D Lee, CBO
Building Official, Fire Marshal
Date: June 7, 2017
Subject: Combined review for photovoltaic system at 4134 E Keim Dr.
Narrative: New photovoltaic system is to be installed. The array is hidden behind the existing parapets.
Description |
Quantities |
Area of Lot |
4.913 acres or 214,020 Sq Ft |
Area Under Roof |
26,320 Sq Ft |
Floor Area Ratio |
12.30% |
Building Site Slope |
13.50% |
Allowable Disturbed Area (%) |
40.51% |
Allowable Disturbed Area (Sq Ft) |
86,700 Sq Ft |
Proposed Disturbed Area (%) |
40.44% |
Proposed Disturbed Area (Sq Ft) |
86,564 Sq Ft |
Volume of Cut/Fill |
0 Cubic Yards |
Hillside Assurance |
$0 |
Number of Retaining Walls |
0 |
Length of Retaining Walls |
0 Ft |
Maximum Building Height |
24 feet 0 inches |
Overall Height |
40 feet 0 inches |
Stipulations:
1. All construction parking shall be located on site as much as possible.
2. No final approval shall be issued until all hillside stipulations and all Town Code requirements are complied with, including landscaping.
3. Noise from construction that can be heard off-site, including, but not limited to, hydraulic ram hammers, equipment used to cut through rock, machinery with audible back-up warning devices, powered machinery, truck delivery and idling, constant and persistent hammering, shall be limited to use between the hours of 7:00 AM and 5:00 PM Monday through Friday; work on Saturday shall be limited to between the hours of 9:00 AM and 5:00 PM, with no work on Sunday or legal holidays. Summer hours start one hour earlier.
4. No Financial Assurance is required.