Paradise Valley Legistar Banner
File #: 17-225    Version: 1 Name:
Type: Hillside Status: Agenda Ready
File created: 6/6/2017 In control: Hillside Building Committee
On agenda: 6/14/2017 Final action:
Title: Combined review for a pool, deck, and pathway located at 6210 E Hummingbird Lane (APN: 169-49-026).
Attachments: 1. Report, 2. Vicinity & Aerial, 3. Application, 4. Narrative, 5. Plans, 6. Noticing Materials, 7. Material Samples
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO: Hillside Building Committee

DATE: June 14, 2017

FROM: George Burton, Planner

SUBJECT: Combined Review for Lyon Residence - 6210 E Hummingbird Lane (APN: 169-49-026). Application for a pool, deck, and pathway.

The owner of the property located at 6210 E Hummingbird Lane submitted an application for a new pool, deck, and pathway.

Site Improvements

* Pool. A new pool and deck will be placed at the northwest part of the property. The pool is a negative edge pool, is 68' long and 15' wide, and will meet the setback requirements. The code requires a minimum setback of 40' from the front property line and a 20' setback from the side and rear property lines. The pool retaining wall is 8' tall and will have a stucco and paint finish. The wall will be painted a dark beige color that has an LRV of 37%.

* Pool Barrier. A metal fin barrier will be placed around the pool area. The barrier is 92% open (80% minimum openness per code) and will be painted a dark brown color (with a light reflective value of 7%) to match the metal accents on the house.

* Pool Deck. The pool deck retaining wall is approximately 7' tall and will have stucco and paint finish. The wall will be painted a dark beige color that has an LRV of 37%. The deck will also be surfaced with a dark beige colored concrete that has an LRV of 32%. The maximum allowable LRV is 38%.

The pool equipment will be fully enclosed and placed below the deck. A cable rail guard will be placed around the deck for fall protection. The guard is 86% open (80% minimum openness per code) and will be painted a dark brown color (with an LRV of 7%) to match the metal accents on the house.

* Hardscape and Landscape. A decomposed granite pathway (with boulder steps) will be placed along the west side of the house. The pathway will extend from the existing driveway down to the new pool. The decomposed granite is a brown color with an LRV of 36%. Also, a mixture of native plants and trees will be placed ar...

Click here for full text