To: HILLSIDE BUILDING COMMITTEE
Cc: Paul Michaud, Senior Planner
George Burton, Planner
From: Robert D Lee, CBO
Building Official, Fire Marshal
Date: March 1, 2017
Subject: Combined review for stair and stucco/paint on casita at 5624 N Superstition Ln
Narrative: The existing stairs from the carport to the home will be removed and replaced. The existing casita/carport will have a stucco system applied and repainted with Dunn Edwards Bison Beige.
Description |
Quantities |
Area of Lot |
1.295 acres or 56,408 Sq Ft |
Area Under Roof |
3,555 Sq Ft |
Floor Area Ratio |
6.30% |
Building Site Slope |
unknown |
Allowable Disturbed Area (%) |
unknown |
Allowable Disturbed Area (Sq Ft) |
unknown |
Existing Disturbed Area |
unknown |
Proposed Disturbed Area (%) |
No change |
Proposed Disturbed Area (Sq Ft) |
No change |
Volume of Cut/Fill |
0 Cubic Yards |
Hillside Assurance |
$0 |
Number of Retaining Walls |
0 |
Length of Retaining Walls |
0 Ft |
Maximum Building Height |
24 feet 0 inches |
Overall Height |
40 feet 0 inches |
Stipulations:
1. All construction parking shall be located on site as much as possible. Any off street parking shall be confined to the east side of N Superstition Ln. No construction materials or debris will be allowed on the Town’s right-of-way.
2. No final approval shall be issued until all hillside stipulations and all Town Code requirements are complied with, including landscaping.
3. Noise from construction that can be heard off-site, including, but not limited to, hydraulic ram hammers, equipment used to cut through rock, machinery with audible back-up warning devices, powered machinery, truck delivery and idling, constant and persistent hammering, shall be limited to use between the hours of 7:00 AM and 5:00 PM Monday through Friday; no work on Saturday, Sunday or legal holidays. Summer hours start one hour earlier.
4. The limits of construction and proposed disturbed areas shall be clearly staked in the field, with visible roping, prior to and during construction and shall conform to the approved individual site analysis plan. No disturbance shall be permitted beyond the areas designated as the limits of disturbance both during and after construction
5. No Financial Assurance is required prior to the issuance of the building permit.