File #: 16-029    Version: 1 Name:
Type: Contract Status: Passed
File created: 1/21/2016 In control: Town Council
On agenda: 1/28/2016 Final action: 1/28/2016
Title: Award of Contract to Markham Contracting in the amount of $33,313.08 for the design of 52nd Street Improvements
Attachments: 1. Project Location Map, 2. Markham Contracting Proposal
Related files: 16-194
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
TO: Mayor Collins and Town Council Members

FROM: Kevin Burke, Town Manager
James P. Shano, P.E., Public Works Director / Town Engineer
Jeremy Knapp, Engineering Services Analyst

DATE: January 28th, 2016

DEPARTMENT: Public Works and Engineering Department

Staff Contact James P. Shano, P.E., Public Works Director / Town Engineer 480-348-3573
End

AGENDA TITLE:
Title
Award of Contract to Markham Contracting in the amount of $33,313.08 for the design of 52nd Street Improvements
Body

Council Goals or Statutory Requirements:
Develop and advance the Capital Improvement Program by maintaining, repairing and adding critical infrastructure in the town.

Improve non-motorized mobility throughout the town by identifying missing linkage to improve pedestrian / bicycle connectivity.

RECOMMENDATION:
Recommendation
Authorize the Town Manager to execute a contract with Markham Contracting in the amount of $33,313.08
Background

SUMMARY STATEMENT:
This project includes a curb realignment along the western side of 52nd Street between Orchid and Tomahawk. Currently the pavement is much wider then the roadway cross section north and south of this block. By shrinking the roadway width, this roadway cross section will be consistent with the rest of 52nd Street. This also allows for the installation of a new sidewalk along this block, completing a missing pedestrian connection.

In addition to new curbs and sidewalks, this project will also relocate an existing storm drain, add ADA accessible ramps, and restripe a bike lane. A total of four residence frontages are directly affected by this project and town staff, with the design engineer, will meet with each individually to assure the new improvements are cohesive with existing landscaping and driveways.

This award is solely for the design, preconstruction services, and construction administration of the above mentioned improvements. It is expected the design will take ...