File #: 15-239    Version: 1 Name:
Type: Contract Status: Passed
File created: 10/13/2015 In control: Town Council
On agenda: 10/22/2015 Final action: 10/22/2015
Title: Award of a Job Order Contract to DBA Construction Inc. for an amount not to exceed $464,529.26 for the installation of concrete sidewalks and ADA accessible ramps at various locations throughout town.
Attachments: 1. Project Location Map, 2. DBA Construction Proposal, 3. Presentation - Asphalt Sidewalk Replacement Award

 

 

TO:                                             Mayor Collins and Town Council Members

 

FROM:                      Kevin Burke, Town Manager

                                            James P. Shano, P.E., Public Works Director / Town Engineer

                                            Jeremy Knapp, Engineering Services Analyst

 

DATE:                     October 22nd, 2015

 

DEPARTMENT: Public Works and Engineering Department

 

Staff Contact

James P. Shano, P.E., Public Works Director / Town Engineer

480-348-3573                     

End

 

AGENDA TITLE:

Title

Award of a Job Order Contract to DBA Construction Inc. for an amount not to exceed $464,529.26 for the installation of concrete sidewalks and ADA accessible ramps at various locations throughout town.

Body

 

Agenda Item Relates to Mission/Vision:

- Provides high quality public services to a community which values limited government

 

Strategic Initiative:

- Regularly invest in public facility and infrastructure projects.

 

Council Goals or Other Policies / Statutory Requirements:

- To provide a high-quality non-motorized circulation system that is effectively planned, managed, operated and maintained.

 

RECOMMENDATION:

Recommendation

Authorize the Town Manager to execute a Job Order Contract with DBA Construction Inc. in an amount not to exceed $464,529.26.

Background

 

SUMMARY STATEMENT:

This project is identified in the FY2015-16 Capital Improvement Plan and includes the removal of existing asphalt sidewalk and replacement with a new six foot wide San Diego Buff colored concrete walk.  The project accomplishes parts of two specific goals (4.5-1.6 and 4.5-1.7) of the Mobility Implementation Program found in Part 4 of the Town’s 2012 General Plan.

 

There are six different areas (See Project Location Map Attachment) that total over one mile of sidewalk.  In addition to sidewalk improvements in these areas, new driveway approaches for residents along the project area and ADA accessible ramps will also be installed.  The contractor will begin work in January 2016, as to avoid disruption to residents during the holiday season.

 

BUDGETARY IMPACT:

This item is included in the FY2015-16 Capital Improvement Plan with a budgeted amount of $530,000.  The construction cost is $422,279.26 with a 10% contingency of $42,250.  The approval of this contract will cost the town $464,529.26

 

ATTACHMENT(S):

Project Location Map

DBA Construction Proposal

PowerPoint Presentation