TO: Chair and Planning Commission
FROM: Jeremy Knapp, Community Development Director
Paul Michaud, Planning Manager
George Burton, Senior Planner
DATE: March 17, 2020
CONTACT:
Staff Contact
George Burton, 480-348-3525
End
AGENDA TITLE:
Title
EPCOR Booster Pump Station Improvements (CUP-20-01)
5402 E Lincoln Dr (APN 169-28-001G and APN 169-28-365E)
Public Hearing
Body
RECOMMENDATION:
Recommendation
It is recommended that the Planning Commission approve the Conditional Use Permit for the EPCOR booster pump station improvements, subject to the following stipulations:
1. All improvements to the water booster pump station shall be in substantial compliance with the project narrative and plans:
a. Narrative, pages 1-7, prepared by Wilson Engineers and dated March 6, 2020;
b. Details, pages 1-11, of the Air Release Valve Enclosure, Acoustical Pump Enclosure for Pump, and the Chemical Metering Pump Enclosure, provided by Wilson Engineers and dated March 6, 2020; and
c. EPCOR Paradise Valley Phoenix Interconnect Booster Pump Station (Phase 2) Plans, Sheets G-1 thru G-5, Sheets C-1 thru C-5, Sheets M-1 thru M-8, prepared by Wilson Engineers and dated August 2019,
2. The Chemical Feed Enclosure must have a tan colored roof.
3. The light located inside the acoustical pump enclosure shall only be used for maintenance and emergency purposes and must be turned off at the conclusion of said maintenance/emergency purpose.
4. If the vegetation adjoining the northern part of the pump station (located between 6667 N Mummy Mountain Rd and the pump station driveway) dies or is removed, then the 8' tall rusted metal fence must be extended along the north part of the pump station (e.g. the same alignment as the existing vegetation) and tie into the existing/eastern Camelback Inn maintenance fence. The extended fence is subject to the approval of the Town Manager or designee and it issuance of all appropriate town permits.
5. New oleander plants an...
Click here for full text